Back to finding a form
Denton County ·

Notify the county before building or expanding a home in unincorporated Denton County

Tells Denton County Public Works where and when you will build a new house or duplex (or a large addition) in an unincorporated area and which residential building code you will follow. A second form in the packet records each required construction inspection.

Free. The official form, fetched from Denton County Department of Public Works, Engineering Division and checked against their copy on 2026-09-29, with what they need from you and how to fill it in below.

Download the blank formHow to fill it in

What to have to hand

Nothing to fetch in advance — the form asks for details you will already know.

Denton County Department of Public Works, Engineering Division · Public Works / Engineering

Denton County, Texas

Is this the right form?

Who files it: The builder or contractor building a new single-family house or duplex, or a large addition to one, in an unincorporated area of Denton County. The inspection form is completed and signed by the inspector the builder hires.

When: Before construction begins on a new home or qualifying addition, and again after each of the three required inspections (foundation, framing and mechanical, and completion).

Not for: Construction inside a city's limits, or in a city's extraterritorial jurisdiction where the city has adopted its own building code (the city's code controls there, though the county still needs the paperwork).

Who qualifies

  • You are building a single-family house or duplex in an unincorporated area of Denton County
  • You are building a new home on a vacant lot begun after February 1, 2010
  • You are adding to an existing home and the addition increases its square footage or value by more than 50%

What the county needs from you

  • Builder or company name, business and mailing address, phone, email and fax
  • A contact person
  • Whether this is a new home on a vacant lot or an addition to an existing home
  • The location address with ZIP code, or the lot and block, subdivision, phase, abstract and tract
  • The date you plan to begin construction
  • Which International Residential Code you will use (the May 1, 2008 edition or the one used in the City of Denton)
  • For each inspection: the inspector's name, contact details and professional registration type and number
  • For each inspection: the date, the construction stage inspected and whether the work complied

How to fill it in

  1. On the Notice of Residential Construction, fill in the builder or contractor information: company name, business address, mailing address if different, phone, email, fax and contact person. (page 6)
  2. Under project information, check whether this is new residential construction on a vacant lot or an addition to an existing residential unit. (page 6)
  3. Give the location address including ZIP code, or the lot and block, subdivision, phase, abstract and tract. (page 6)
  4. Enter the date you plan to begin construction and check which International Residential Code you will use: the edition published May 1, 2008, or the one applicable in Denton. (page 6)
  5. Have an authorized representative sign, print their name and date the notice, then give it to Denton County Public Works before construction starts. (page 6)
  6. Hire a qualified inspector (for example a licensed engineer, registered architect, or inspector licensed by the Texas Real Estate Commission) for the three required inspections: foundation, framing and mechanical systems, and completion. (page 2)
  7. For each inspection, the inspector fills in the Notice of Residential Construction Inspection Compliance: their contact information and professional registration, the inspection date and project location. (page 7)
  8. The inspector checks the type of construction, the residential code used, the construction phase inspected, and whether the project is in compliance, adds any comments, then signs, prints their name and dates it. (page 7)
  9. Give each inspection notice to the home buyer and to Denton County Public Works, no later than the 10th day after the final inspection. (page 4)

Signing: The builder's authorized representative signs the construction notice; the inspector signs each inspection compliance notice.

This is Denton County’s own form, exactly as they publish it. Fetched from the county and checked against their copy. How to fill it in is below, and the guide can answer questions about it.

Where it goes

Follow the instructions printed on the form itself.

Timing: The construction notice must be given before construction begins. Inspection notices are due to Public Works and the buyer no later than the 10th day after the final inspection.

Official source

Issued by: Denton County Department of Public Works, Engineering Division

The official form is published by Denton County Department of Public Works, Engineering Division and is also available on its website, dentoncounty.gov. It is free from them.

Checked against Denton County Department of Public Works, Engineering Division’s own copy on 2026-09-29.

We review our forms for changes every six months. If Denton County Department of Public Works, Engineering Division has changed this form since, its current form applies and ours may be out of date — check its website before you send.

Download the blank PDF

An independent service, not affiliated with Denton County Department of Public Works, Engineering Division.